Tuesday, October 14, 2008
2nd Level
The 2nd level classroom is basically completed. It has four walls and a roof. We still need to install the windows and doors and lay the tile floor. Also we need to put in the stairs so we can get from 1st level to 2nd level; and install the toliet for the bathroom. The 2nd level is twice the size of the 1st level.
Subscribe to:
Post Comments (Atom)


No comments:
Post a Comment